September 2018 - 2
Posted on 9th September 2018 at 16:32
Therapy Equipment Ltd has been the preferred supplier at Royal National Orthopaedic Hospital, Stanmore for many years, and were therefore
pleased to work with the Hospital in the supply of the SOT required within the 1st Phase of the redevelopment.
The new inpatient facility, which incorporates 91 beds (50% single beds) is the first phase in the long term plans for redeveloping the existing site.
Many of the existing buildings date back to before the Second World War.
